選課分析
| Home work/Quiz/Class Presentation | 30 | |
| Midterm Examination | 30 | |
| Term Project | 40 | 依課程進度各組完成相對應的 MPCS 重要子系統案例 |
1. Background, framework and components of MPCS. 2. Knowledge and skill of writing an MPCS related research paper.
1. Background, framework and components of MPCS. 2. Knowledge and skill of writing an MPCS related research paper
Jacobs, F. R., W. L. Berry, D. C. Whybark and T. E. Vollmann, Manufacturing Planning and Control for Supply Chain Management: APICS/CPIM Certification Edition, 5th. Edition, McGraw-Hill, 2011 (online, 2014). (JB)
Paper readings (PR):
1. Olhager, J. and R. Birger, Operations research in manufacturing planning and control systems, Int. Trans. Opl. Res., 2 (1), pp. 29-43, 1995.
2. Leachman, R. C., R. F. Benson, C. Liu, D. J. Raar, IMPReSS: An automated production-planning and delivery-quotation system at Harris corporation – semiconductor sector, Interface, 26 (1 Jan.-Feb.), pp. 6-37, 1996.
3. 周玉俐,王立志,2010,「成霖公司需求鏈管理解決方案的發展」,電子商務學報,我國產業個案專刊,1-24頁。
4. Ponsignon, T. and L. Monch, Simulation-based performance assessment of master planning approaches in semiconductor manufacturing, Omega, Vol. 46, pp. 21-35, 2014.
5. Lin, J. T., I. H. Hong, C. H. Wu, K. S. Wang, A model for batch available-to-promise in order fulfillment processes for TFT-LCD production chains, Computers & Industrial Engineering, 59, pp. 720-729, 2010.
6. Nazzal, D., M. Mollaghasemi, D. Anderson, A simulation-based evaluation of the cost of cycle time reduction in Agere Systems wafer fabrication facility- a case study, Int. J. Production Economics, 100, pp. 300-313, 2006.
7. Liu, J., F. Yang, H. Wan, and J. W. Fowler, Capacity planning through queueing analysis and simulation-based statistical methods: a case study for semiconductor wafer fabs, Int. Journal of Production Research, Vol. 49, No. 15, pp. 4573-4591, 2011.
8. Yang, F., Neural network metamodeling for cycle time-throughput profiles in manufacturing, European J. of Operations Research, Vol. 205, pp. 172-185, 2010.
9. 王立志,曾雅彩, 2007,「花仙子之需求與配銷規劃」,管理評論,第26卷,55-70頁,中華民國96年12月。
10. Wang, L. and S. K. Lin, A multi-agent based agile manufacturing planning and control system, Computers & Industrial Engineering, Vol. 57, pp. 620-649, 2009.
11. 葉信岐,「能自身調整在製品數量之模擬排程設計」,碩士論文,2012。
12. Farahani, R. Z., S. Rezapour, T. Drezner, S. Fallah, Compet